THE FIELD CLUB HANDICAPPED
RENOVATIONS Sarasota, FL
Progress Estimating:
- worked closely with architect on this
$1.2 million dollar project
- used detailed estimating to capture
many handicapped renovations
- did 5 repeat projects here including captains
dining room renovation |
GOCIO ELEMENTARY SCHOOL
Sarasota, FL
Progress Estimating & Value
Engineering:
- used CSI 16 Division Range/Parameter/Single-Line/Multi-
Line/
Detailed estimate methods- produced preliminary/schematic/design-
development/
construction document estimates
- value engineered $1,000,000.00 in
cost savings including steel arched to gable roof |
 |
 |
TEMPLE
EMANU-ELSarasota, FL
Conceptual Estimating:
- produced a
CSI 16 Division
Conceptual Cost Estimate to establish the
budget - detailed takeoff and pricing was
applied for the
renovation areas of work
|
|
SARASOTA
EXCEPTIONAL
STUDENT CENTER Sarasota, FL Progress Estimating:
- used CSI 16 Division
Range/Parameter/Single-Line/Multi-
Line
/Detailed estimate methods
-
performed preliminary/schematic/design-
development
/construction document estimates
- worked closely with architect on this $13,000,000.00
multi-building campus
project - also progressively estimated
the Therapy Center Building
|
 |
 |
WELLSLEY
HOTELS Palm Beach,
FL Conceptual Estimating:
- performed 16 CSI Division
Conceptual Cost Estimate from
schematic plans
- also worked up general conditions,
bar chart schedule and end
percentages
|
|
SOUTHGATE
MALL RENOVATION Sarasota, FL Hard Bid Estimating:
-
made takeoffs and pricing of drywall
for subcontractor
- assembled package and put bid
in to owner
|
 |
 |
LAUREL
PARK RECREATION
FACILITY Laurel, FL
Pre-Bid
Estimating:
-
was engaged to do pre-bid estimating
and achieve a 5% to 10% cost accuracy
-
worked side-by-side with project
architect, meeting together often
- all estimating was accomplished
100% in-house including
mechanical/electrical
|
|
TAMPA
INTERNATIONAL AIRPORT, AIRSIDE F Tampa, FL
Progress
Estimating:
-
developed on-site 16 CSI Division progress estimates on this
$95,000,000.00 job
-
worked closely with on-site
engineers and off-site architects
-
commuted daily from Sarasota to project job trailer to perform our
services
- used KCC portable digitizer /
computer /
printer on-site
|
 |
 |
COVENANT
LIFE PRESBYTERIAN CHURCH Sarasota, FL
Master
Plan Estimating:
-
worked closely with architect in
pre-construction schemes, planning and
cost
-
accuracy was important from the
outset to determine the correct budget
- achieved early-on $3.5 million dollar conceptual/master plan
cost estimate
More Pictures
|